Boiler activities – 78022 taken out, 85 put in!

With the Standard 4 Locomotive Preservation Society’s BR Standard 4 4-6-0 75078 now in service, just requiring routine maintenance and lining out, attention have now been turned to their second locomotive 78022, BR Standard 2MT 2-6-0.

Brian France reports that on 11th March, 78022 came out into the open and, as his photographs show, the boiler was lifted from the frames for a detailed inspection to take place to determine the amount of work required to return this popular engine to full working order.

78022-150311'1-BF78022-150311'2-BF

As reported previously the boiler for Taff Vale O2 0-6-2T 85 passed its boiler test and, with the crane already in attendance, the opportunity was taken to lift its boiler back into the frames, bringing the engine another step closer to returning to traffic.

Featured image: Robin Lush

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s